Project: RansS20.5RP   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Paul Lutz   -  
Project:   Rans S-20.5 Raven   -   VIEW REPORTS
Total Hours:23.7
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jul 11, 2021 - No Finish Date
Engine:Lycoming O235
Propeller:Catto
 
Friendly URL: https://eaabuilderslog.org?s=RansS20.5RP

Home or Last Project Picture

Mar 12, 2023     Wingtip - (2 hours)       Category: Wings
Dimpled tip rib for attaching rivets. Riveted wingtip rib to wing. Routed wiring for electric fuel pump. Added the fuel pump switch inline with the other switches. Cut out new hole in carbon panel for switch inserts. Tested operation of switch with success.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.